Saint Brieuc: one of France’s most significant offshore wind projects

496 MW

generated by wind turbines

67 km

of offshore cables

Partnership

RTE

Market

Offshore wind farms

Location

France

offshore-wind-north-sea

Context

RTE France has awarded Nexans a €115 million contract to supply and install power export cables for the Saint Brieuc offshore wind farm. This project, developed by the Ailes Marines Consortium, is a pivotal component of France’s renewable energy strategy, aiming to meet the electricity demands of over 835,000 homes while advancing climate change goals.

Challenges

Started in 2021, the project faces challenges in designing, laying, and maintaining the extensive offshore and onshore cable infrastructure necessary to connect the wind farm to the grid. Additionally, ensuring reliability and efficiency amidst the harsh marine environment presents a significant technical challenge.

496 MW

generated by wind turbines

225 kV

maximum voltage

835,000

homes provided with
energy from this wind farm

67 km

of offshore cables

93 km

of onshore cables

Nexans’ implication

Nexans delivered innovative solutions for both offshore and onshore cable needs. For the submarine cables, Nexans supplied two lengths of 33.5 km 225 kV 3-core cable with an innovative hybrid armoring solution, manufactured in our Halden facility, in Norway. The cable also features a fiber optic element, supplied by our Norway plant in Rognan, for remote health monitoring of the cable link and transmission of information between the offshore wind farm and land base. Cables were installed by Nexans’ own cable-laying vessel, the CS Skagerrak, while the specialized Capjet system has been used to trench the cables into the seabed for protection. Nexans also provides Inspection, Maintenance, and Repair (IMR) services, ensuring the longevity and reliability of the offshore transmission system.

The land cables include 93 km of 225 kV single-core cable, manufactured in our Charleroi facility in Belgium, similar to those provided to RTE by Nexans under the current land cables framework agreement.

Nexans factory in Halden, Norway

Nexans factory in Halden, Norway

Nexans employee at Charleroi factory in Belgium

Nexans employee at Charleroi high voltage factory, in Belgium

Nexans employee at Rognan factory in Norway

Nexans employee at Rognan factory, in Norway

Nexans Skagerrak

Nexans Skagerrak

Nexans Skagerrak

Nexans Skagerrak

Nexans Capjet 1 and Capjet 3, on the Skagerrak

Nexans Capjet 1 and Capjet 3, on the Skagerrak

This project will be the first offshore connection developed by Nexans for RTE. As such, RTE expects this project to be successful as well as to mark the beginning of a fruitful relationship.

Jean-Michel Prost

Marine Activities Director, RTE

Nexans’ involvement extends from manufacturing at their facilities in Norway and Belgium to cable laying with their specialized vessel. Laurent Guillaumin, Business Development Director – Offshore Wind Europe, emphasized, ” We are delighted to be working with RTE to provide the grid connection for one of France’s most significant offshore wind projects. The key to this success was our long track record in this sector combined with our ability to offer innovative cable solutions.

As of spring 2024, the Saint Brieuc offshore wind project is progressing towards commissioning, with Nexans playing a crucial role in ensuring the timely and successful completion of the grid connection. The progressive commissioning marks a significant milestone in France’s renewable energy transition, bringing the nation closer to its ambitious climate targets.

More about Nexans solutions

Offshore wind farms

Discover our success stories

offshore-wind-north-sea-thumbnail

Offshore wind farms

Saint Brieuc: one of France’s most significant offshore wind projects
offshore wind farm - Nexans employee

Offshore wind farms

“DolWin6” offshore DC link
thumbnail-hywind

Offshore wind farms

Hywind project: first floating wind farm