News & Media Room

Find all our news, press releases and upcoming events.

banner-distribution-networks

Press releases

Nexans Electra at Ulstein Verft in Norway
Innovation

Nexans Electra hull launch: Key milestone for next-generation cable lying vessel

The Nexans Electra was launched from the dock hall at Ulstein Verft on November 13, 2025, marking a key milestone toward the vesselโ€™s completion. Scheduled to be delivered in 2026, it will enhance Nexansโ€™ ability to deliver complex EPCI subsea cable projects globally. The vessel, is designed to meet the worldโ€™s growing demand for offshore wind and interconnector cable systems, furthering Nexansโ€™ commitment to electrifying the future.

Nexans Electra at Ulstein Verft in Norway

Nexans news

2025 ESG webinar with Daniel Hojniak, Isabelle Hoepfner-Lรฉger, Mike Smith, David Grall and Marc Boilard

CSR

24 October 2025

Building a sustainable and resilient future

From mine to end customer, discover how industry leaders โ€” Nexans, Rexel, KGHM, and The Copper Mark โ€” are redefining transparency, circularity, and sustainability. Explore how collaboration and innovation are turning ESG principles into concrete action for a more responsible and resilient future.

Aerial view of a large industrial facility surrounded by mountains and trees

Interconnexion

14 August 2025

Nexans advances key stage in Malta-Sicily Interconnector project

Nexans has reached a major milestone in the Maltaโ€“Sicily Second Interconnector project, with production now well underway at two of its state-of-the-art facilities in Norway and the United States.

Crane lifting a circular structure over the ocean at sunset.

Interconnexion

06 August 2025

Completes critical repair of Estlink 2 subsea interconnector between Finland and Estonia

Nexans, a global leader in the design and manufacturing of cable systems and services, specializing in the offshore wind sector and subsea interconnectors, has completed the repair of the Estlink 2 interconnector under contract for Fingrid, Finlandโ€™s transmission system operator. The successful operation reinstates one of the Baltic regionโ€™s most important electricity links.