Company
- Company
- Strategy: A pure player in electrification
-
CSR
- Overview
- Our CSR approach: 1 scorecard and 3 pillars
- Our contribution to carbon neutrality by 2030
- Innovation, a leverage point in the energy transition
- Being the preferred choice for making a difference
- Nexans purchasing’s and suppliers commitment to CSR
- Ethics & Compliance
- CSR Governance
- CSR performance
- Innovation
- Sponsorships
- Executive Committee
- Corporate Governance
- Locations
- Markets
- Services & Solutions
- Newsroom
- Insights
- Investors
- People & Careers
- Search
- Contact us
Case study
FennoSkan

-
LOCATIONFinland & Sweden
-
MARKETPower networks - Subsea
Project description:
- A subsea power transmission cable between southern Finland and Sweden following a 200 km long route over the Bay of Bothnia.
- It constitutes a bipole together with the existing 550 MW, 400 kV FennoSkan connection, in operation since in 1989.
Customer challenges:
- The customer wanted to improve capacity in the Nordic power market and to reduce losses in the Nordic transmission grids at the same time as improving power system reliability.
- The FennoSkan 2 should provide a 40 percent increase in the power transmission capacity between the two countries.
Nexans' solutions:
- The HVDC cable was approx. 200 km long with a capacity of 800 MW and 500 kV.
- With a copper cross-section of 2000 mm2, this was the largest HVDC cable produced by Nexans at the time of installation .
- The cable was supplied in two continuous lengths of around 100 km each, requiring just a single splice offshore.
- Laying of the cable was carried out in 2011 by use of C/S Nexans Skagerrak and the cable was protected by use of Nexans' Capjet system.
Our websites
Select your country to find our products and solutions
-
Africa
- Africa
- Ghana
- Ivory Coast
- Morocco
- North West Africa
- Americas
- Asia
- Europe
- Oceania