High voltage subsea power export cables will connect London Array wind farm to the UK grid

  • LOCATION
    UK
  • PARTNERSHIP
    Ørsted
  • MARKET
    Wind farms-Offshore
630 MW

GENERATED OF WIND TURBINES

170 kV

MAXIMUM VOLTAGE

4x53 km

OF OFFSHORE CABLES

High voltage subsea power export cables will connect the world’s largest wind farm to the UK grid.

 

About the project

The London Array wind farm was installed on a 233 km2 site located around 20 km off the UK coast. Construction took place in two phases: the first phase of 630 MW, consisting of 175 turbines, was completed and generating in 2012; the future second phase will add capacity to bring the total to 1,000 MW and will supply enough power for around 750,000 UK homes.

Nexans' solutions

The power export cable contract comprises the design, manufacture, and supply of four 150 kV XLPE submarine power cables to be laid in parallel, each 53 to 54 km in length, with three copper core conductors with a cross-section of 630 mm2 for the main length and 800mm² at each cable end. Nexans will deliver two of the cables in 2011, and two in 2012, all being delivered in single continuous lengths from Nexans’ factory in Halden. The cables will also incorporate fibre optic elements manufactured at the Nexans factory in Rognan, Norway. In addition, the contract also includes cable accessories such as repair joints and terminations.

Contact us

Topics on which you wish to get more informations:

Required fields*

Please check your entry and try again.

An email address must contain a single @

Personal data protector

You have the right to object to the processing of your personal data and/or their use for direct marketing or commercial purposes

Thank you!

Thanks for contacting us. We will be in touch with you shortly.

Error

An error occurred. Please try again.

Close