Sustainable data centers: cutting the carbon impact of power cabling

Nexans acts on the share of a power cable’s carbon footprint it controls: low-carbon cables that cut manufacturing emissions by at least 35%, certified carbon data for Scope 3 reporting, and cable recycling with a 99% recovery rate. Nexans Data Center Power supports operators, developers and EPCs at every phase of the project, from cable specification to end-of-life recycling.

Key figures

5%

of a power cable’s lifecycle carbon emissions occur before installation (Source: Nexans PEP ecopassport data)

-35%

minimum COโ‚‚ reduction with Nexans low-carbon cables compared with standard references (Certified by Bureau Veritas)

98%

of the Nexans product range covered by certified carbon data (Source: Nexans)

LIFECYCLE

Where a data center cable’s carbon footprint comes from

A power cable’s carbon footprint is spread across four stages: raw materials and manufacturing, installation, operation and end of life. Manufacturing accounts for around 5% of the total, and it is the stage where a cable maker acts directly. Operation accounts for most of the rest, because every ampere flowing through a conductor generates resistive losses, known as the Joule effect, for 25 to 40 years.

Why data centers amplify the effect

An office building draws power unevenly through the day. A data center runs 24/7 at a high load factor, so cable losses accumulate almost continuously over the life of the facility.

Rising power densities add to this. As AI racks reach 80 to 100 kW, currents rise in low-voltage distribution, and losses grow with the square of the current. Sizing decisions belong to the designer and the operator, and Nexans engineering teams support them at the design stage to limit losses over the life of the facility.

PRODUCTION

-35%

COโ‚‚ emissions with Nexans low-carbon cables

INSTALLATION

Traced

construction offcuts, from site to recycling, with CableLoop

END OF LIFE

99%

material recovery rate with CableLoop

DESIGN

Design: lock in efficiency before a single cable is laid

Decisions taken at the design stage set a data center’s electrical losses for the life of the facility. Nexans engineering teams work with designers and EPCs to size and specify cables for reliability and energy performance together.

Cable sizing for 24/7 loads

A larger conductor cross-section costs more upfront but cuts losses for decades. Economic cable sizing, described in IEC 60287-3-2, finds the optimum between capital cost and lifetime energy cost. With a continuous load, that optimum moves toward larger sections.

Lower distribution losses, better PUE

Losses in the power chain upstream of IT equipment count as non-IT energy in Power Usage Effectiveness. Reducing losses in medium- and low-voltage distribution cables contributes directly to PUE targets.

Designing for AI-scale densities

Sizing the electrical architecture for future rack densities avoids two costs: premature re-cabling and a permanent efficiency penalty. The choice between medium- and low-voltage distribution matters as much as the cables themselves.

low carbon program

Specifying low-carbon cables

The manufacturing stage is small in a cable’s lifecycle, but it is the share that lands directly in a data center’s construction footprint. Nexans low-carbon cables reduce manufacturing COโ‚‚ emissions by at least 35% compared with standard references, as certified by Bureau Veritas. They combine low-carbon aluminium, recycled metals and recycled plastics, and keep the same electrical and fire safety performance.

Lower-loss power architectures

For high-density and hyperscale projects, architecture choices reduce losses further: 800 VDC distribution removes successive AC/DC conversion stages, and HTS superconducting cables carry very high power with near-zero electrical losses.

SUPPLY & INSTALL

Supply & Install: certified carbon data for Scope 3 and green building ratings

Hyperscale tenants, investors and CSRD disclosures all require verifiable carbon data on construction materials. Nexans provides certified environmental data that operators can use directly in their Scope 3 reporting.

What Scope 3 means for a data center

Under the GHG Protocol, a company’s greenhouse gas emissions are split into three scopes. Scope 1 covers direct emissions from sources it owns, such as diesel backup generators. Scope 2 covers emissions from the electricity it buys, which is where cable losses show up. Scope 3 covers all other indirect emissions across the value chain, upstream and downstream, including the manufacturing of the equipment and materials it purchases. It is often the hardest share to measure, because it depends on data from suppliers.

Scope 3 Category 1 data, ready to report

Cables bought for a data center fall under Scope 3 Category 1, purchased goods and services. Nexans PEP ecopassport declarations, verified under ISO 14025, are available on product pages in a format that integrates into ESG reporting tools. For a specific project, Nexans can calculate a certified COโ‚‚e figure from the actual cable bill of materials, typically within 48 to 72 hours.

Supporting LEED certification

Green building certification is now a common lease condition for large tenants. Nexans PEP data can contribute up to two LEED points.

Construction offcuts, tracked from site to recycling

A data center build generates large volumes of cable offcuts. CableLoop collects them on site and documents each waste transfer through to the recycling facility, giving sustainability teams an auditable record for CSRD reporting.

ISO 14025

Independently verified PEP ecopassport declarations

Up to 2

LEED points supported by Nexans PEP data

48โ€“72 h

to deliver a project-specific COโ‚‚e figure

END OF LIFE

End of life: circular cabling across refresh and decommissioning cycles

A data center is re-cabled several times over its life: when data halls are densified for AI loads, when equipment is refreshed, and when a site is finally decommissioned. Each cycle releases large volumes of copper, aluminium and polymers. CableLoop turns this waste into traceable secondary raw materials.

Refresh cycles are also an opportunity on the use side: the new cables can be specified for lower losses at higher densities, while the removed cables go straight into the recycling loop.

CableLoop, the Nexans take-back and recycling service, covers collection, waste transfer certificates and reporting on recovered metals. Recovered copper and aluminium are reused in Nexans low-carbon cable production. The service helps operators meet their waste management obligations under the EU Waste Framework Directive (2008/98/EC) and national regulations.

99%

material recovery rate with CableLoop

30,000 t

of cables recycled every year through CableLoop

25%

recycled copper and aluminium targeted in Nexans production by 2028

red geometrical forms on grey background
red geometrical forms on grey background
INSIGHTS

Power cables and accessories for data centers

Two white papers on securing power supply and infrastructure reliability: cable selection, joints and terminations, installation quality.

Explore the white papers
FAQ

Data center sustainability: FAQ