Company
- Company
- Strategy: A pure player in electrification
-
CSR
- Overview
- Our CSR approach: 1 scorecard and 3 pillars
- Our contribution to carbon neutrality by 2030
- Innovation, a leverage point in the energy transition
- Being the preferred choice for making a difference
- Nexans purchasing’s and suppliers commitment to CSR
- Ethics & Compliance
- CSR Governance
- CSR performance
- Innovation
- Sponsorships
- Executive Committee
- Corporate Governance
- Locations
- Markets
- Services & Solutions
- Newsroom
- Insights
- Investors
- People & Careers
- Search
- Contact us
Case study
State-of-the-art installation for the Abu Dhabi Electrical Authority

-
LOCATIONAbu Dhabi
-
PARTNERSHIPAbu Dhabi Electrical Authority
-
MARKETPower networks - Land HV
Project description:
- To meet the energy demands of a million-plus city, Nexans laid the largest
and heaviest 420 kV cable that has ever been installed.
Customer challenges:
- Because several laying methods had to be used (ducts, direct buried, and concrete troughs), the customer wanted extensive long-term tests.
- They expected full responsibility for civil work, supply and installation of all cables and accessories with full quality assurance.
- Trenches were not allowed across certain roads; and dust and heat were a hindrance.
Nexans solutions:
- Nexans assumed full responsibility for the project and set up a local dedicated team to interface with the customer and subcontractors.
- Directional drilling was used to install 400m long flexible pipes, often 30 meters deep.
- Original sand and soil was used as thermal backfill.
- Air-conditioned booths were built for jointing.
- Constant control included waste management and respect for the environment.
Our websites
Select your country to find our products and solutions
-
Africa
- Africa
- Ghana
- Ivory Coast
- Morocco
- North West Africa
- Americas
- Asia
- Europe
- Oceania