Case study

Mallorca Ibiza

  • LIEU
    Spain
  • PARTENAIRE
    Red Eléctrica de España
  • MARCHÉ
    Réseaux d'énergie - Sous-marin

About the project

REE, Red Eléctrica de España, the Spanish transmission system operator, ordered in 2014 the 90 million Euro cable link between Ibiza and Mallorca for the latest phase in a project to link the Balearic Islands to the mainland grid on the Iberian Peninsula. The aim was to provide the islands with a more reliable, energy efficient and lower emission power supply.

Nexans' solution

The 119 km cable, designed, manufactured and installed by Nexans featured state-of-the-art XLPE insulation. It set two world records for both the longest 3-core high-voltage (132 kV) AC connection, and the deepest at 800 metres at the time. The cable was manufactured in Nexans’ specialized subsea cable plant in Halden.

Contactez-nous

Sujets sur lesquels vous souhaitez obtenir plus d'informations :

* Champs obligatoires

Veuillez vérifier votre saisie et réessayer.

Une adresse mail ne peut contenir qu'un seul @

Protection des données personnelles

Vous avez le droit de vous opposer au traitement de vos données personnelles et/ou à leur utilisation à des fins de marketing direct ou à des fins commerciales.

Merci !

Merci de nous avoir contactés. Nous vous contacterons sous peu.

Erreur

Une erreur s'est produite. Veuillez réessayer.

Fermer