Case study

Gode Wind 1 & 2

  • LIEU
    Germany
  • PARTENAIRE
    Ørsted
  • MARCHÉ
    Fermes éoliennes-Offshore
330 + 252 MW

GENERATED OF WIND TURBINES

36 kV

MAXIMUM VOLTAGE

134 km

OF OFFSHORE CABLES

Nexans cables boost Germany’s Energy Turnaround in offshore wind farms.

 

About the project

Wind energy is a vital element in Germany’s ongoing Energy Turnaround (Energiewende). The wind farms, which lie around 45 km off the coast - just off the islands of Norderney and Juist, will have a capacity of 582 MW - enough to power around 600,000 German homes. Total investment for the two projects stands at around €2.2 billion with construction commencing in Spring 2015.

Nexans' solutions

Ørsted (previously DONG Energy) is set to increase its offshore wind power capacity in Germany after signing a contract with Nexans for the delivery and installation of 140 km of 34 kV cables. The inter-array cables will link individual turbines at the Gode Wind 1 and 2 wind farms and connect them to an offshore transformer platform, off the Lower Saxony coast in north-east Germany.

Contactez-nous

Sujets sur lesquels vous souhaitez obtenir plus d'informations :

* Champs obligatoires

Veuillez vérifier votre saisie et réessayer.

Une adresse mail ne peut contenir qu'un seul @

Protection des données personnelles

Vous avez le droit de vous opposer au traitement de vos données personnelles et/ou à leur utilisation à des fins de marketing direct ou à des fins commerciales.

Merci !

Merci de nous avoir contactés. Nous vous contacterons sous peu.

Erreur

Une erreur s'est produite. Veuillez réessayer.

Fermer