630 MW

GENERATED OF WIND TURBINES

170 kV

MAXIMUM VOLTAGE

4x53 km

OF OFFSHORE CABLES

High voltage subsea power export cables will connect the world’s largest wind farm to the UK grid.

 

About the project

The London Array wind farm was installed on a 233 km2 site located around 20 km off the UK coast. Construction took place in two phases: the first phase of 630 MW, consisting of 175 turbines, was completed and generating in 2012; the future second phase will add capacity to bring the total to 1,000 MW and will supply enough power for around 750,000 UK homes.

Nexans' solutions

The power export cable contract comprises the design, manufacture, and supply of four 150 kV XLPE submarine power cables to be laid in parallel, each 53 to 54 km in length, with three copper core conductors with a cross-section of 630 mm2 for the main length and 800mm² at each cable end. Nexans will deliver two of the cables in 2011, and two in 2012, all being delivered in single continuous lengths from Nexans’ factory in Halden. The cables will also incorporate fibre optic elements manufactured at the Nexans factory in Rognan, Norway. In addition, the contract also includes cable accessories such as repair joints and terminations.

Layer 1
Marché associé
Éolien offshore Découvrir

Contactez-nous

Sujets sur lesquels vous souhaitez obtenir plus d'informations :

* Champs obligatoires

Veuillez vérifier votre saisie et réessayer.

Une adresse mail ne peut contenir qu'un seul @

Protection des données personnelles

Vous avez le droit de vous opposer au traitement de vos données personnelles et/ou à leur utilisation à des fins de marketing direct ou à des fins commerciales.

Merci !

Merci de nous avoir contactés. Nous vous contacterons sous peu.

Erreur

Une erreur s'est produite. Veuillez réessayer.

Fermer