Référence

Projet de terminal GNL

Yemen project
  • LIEU
    Yemen
  • PARTENAIRE
    YEMGAS FZCO
  • MARCHÉ
    Pétrole et Gaz - Downstream

Project description:

  • A project commissioned by YEMGAS FZCO on behalf of Yemen LNG Ltd (YLNG)
  • New plant located on the Arabian Gulf port of Balhaf (southern coast of Yemen)
  • Two LNG liquefaction trains capable of delivering a total of 6.7 million tons of LNG per year

Customer challenges:

  • A complex oil & gas project
  • Optimize the supply chain: select one reliable supplier to provide the cables to carry power, data and telecommunications throughout the terminal

Nexans solutions:

  • 1,100 km of medium-voltage and low-voltage power, instrumentation and optical cables armored with steel tapes
  • Cables manufactured by Nexans plants in Belgium and France, and installed in 2007

Contactez-nous

Sujets sur lesquels vous souhaitez obtenir plus d'informations :

* Champs obligatoires

Veuillez vérifier votre saisie et réessayer.

Une adresse mail ne peut contenir qu'un seul @

Protection des données personnelles

Vous avez le droit de vous opposer au traitement de vos données personnelles et/ou à leur utilisation à des fins de marketing direct ou à des fins commerciales.

Merci !

Merci de nous avoir contactés. Nous vous contacterons sous peu.

Erreur

Une erreur s'est produite. Veuillez réessayer.

Fermer