Case study

Mallorca Ibiza

  • LIEU
    Spain
  • PARTENAIRE
    Red Eléctrica de España
  • MARCHE
    Réseaux d'énergie - Sous-marin

About the project

REE, Red Eléctrica de España, the Spanish transmission system operator, ordered in 2014 the 90 million Euro cable link between Ibiza and Mallorca for the latest phase in a project to link the Balearic Islands to the mainland grid on the Iberian Peninsula. The aim was to provide the islands with a more reliable, energy efficient and lower emission power supply.

Nexans' solution

The 119 km cable, designed, manufactured and installed by Nexans featured state-of-the-art XLPE insulation. It set two world records for both the longest 3-core high-voltage (132 kV) AC connection, and the deepest at 800 metres at the time. The cable was manufactured in Nexans’ specialized subsea cable plant in Halden.

Contact us

Sujets sur lesquels vous souhaiteriez obtenir plus d’information:

Champs obligatoires*

Veuillez vérifier les informations saisies et réessayer

Une adresse email doit contenir un seul @

Protection des données personnelles

Vous disposez d’un droit d’opposition à ce que les données à caractère personnel vous concernant fassent l’objet d’un traitement et/ou à ce qu’elles soient utilisées à des fins de prospections, notamment commerciales

Merci!

Merci pour votre message. Nous prendrons contact avec vous dans les plus brefs délais.

Erreur

Une erreur s'est produite. Veuillez réessayer.

Fermer