Dunkirk LNG project

Dunkirk LNG projectProject description:

  • Development of a regasification plant in the port of Dunkirk, in northern France.
  • Commissioned by SENER.

Customer challenges:

  • Fire performance.
  • Short lead-time for Low Voltage package.
  • Meet end-user technical specifications.

Dunkirk LNG projectNexans solutions:

  • 1,300 km of low-voltage and medium voltage power cables armoured with steel tape.
  • Expertise in fire performance cables with capability to test in factory (Fire test NF C 32070 CR1).
  • General know-how for French specs cables and long experience on the LNG Terminals.