français Login Contact Us
Global expert in cables and cabling system

About Nexans

Products and Solutions

Customer Service

Finance

Work at Nexans

News and Press

Go

Wolfe Island

Send link to this page Your Nexans contact on this page

Wolfe Iland w561 

Project description:

  •  The Wolfe Island Wind Project consists of 86 2.3 MW wind turbines located on Wolfe Island, at the eastern end of Lake Ontario, in operation from 2008. 


Customer challenges:

  • Canadian Renewable Energy Corporation (CREC), a subsidiary of Canadian Hydro Developers Inc., needed design, manufacturing and supply of a world record-breaking high-voltage submarine power cable for the Wolfe Island Wind Project, near Kingston, Ontario, in Canada. 


Wolfe Iland w120Nexans'  solutions:

  • The 7.8 km long cable was at the time the world’s first 3-core XLPE submarine cable to achieve a voltage rating of 245 kV.
     
  • The Nexans cable will be laid on the bottom of the St Lawrence River, at a maximum water depth of 23 m.
 

Photo Credit: Trudy deRuiter





 TOP
Nexans © copyright 2001 - 2012   Legal Notice | Contact Us | Site Map