|
|
|
|
Nexans launch LANmark-6A, enabling channels as short as 12m in data centres
|
|
More...
|
|
|
|
|
Nexans launches LANmark-7A in preparation for 40G
|
|
More...
|
|
|
|
|
21st November 2007 - Interxion installs Nexans’ cabling solutions to increase the reliability and durability of its dedicated hosting facilities
|
|
More...
|
|
|
|
|
Nexans Cabling Solutions is proud to launch a new LANmark/LANconnect Warranty application system.
|
|
More...
|
|
|
|
|
12th October 2007. Reliable Intelligent Infrastructure Management (IIM) tools provide the audit trails for compliance with good governance commitments
|
|
More...
|
|
|
|
|
Paris, September 25, 2007 – Nexans has launched a new GG45 8-contact high-speed Category 7A jack for use on Printed Circuit Boards (PCBs).
|
|
More...
|
|
|
|
|
High Performance Structured Cabling and LANsense intelligent network installed at flagship headquarters in Moscow
|
|
More...
|
|
|
|
|
High Performance FTP copper cabling and LANsense intelligent network installed at flagship headquarters of one of the worlds largest banks
|
|
More...
|
|
|
|
|
Paris, June 22, 2007 – New design delivers increased flexibility by providing a future upgrade path to LANsense Intelligent Infrastructure Management (IIM)
|
|
More...
|
|
|
|
|
Brussels, May 22, 2007 - With its cutting-edge LANsense and LANmark offerings, Nexans provides Cabling Intelligence as the ‘missing link’ in network integration
|
|
More...
|
|
|
|
|
Nexans Mark II LANsense analyser achieves over 70% reduction in power consumption and heat output.
|
|
More...
|
|
|
|
|
NCS installs future-proof, robust cabling solutions on the RRS James Cook - a new oceanographic research vessel operated by the UK's National Oceanography Centre.
|
|
More...
|
|
|
|
|
Paris, January 3, 2007 – Nexans has been awarded a 5.91 million Euro contract by the Incheon International Airport Corporation (IIAC) to supply LANmark fibre optic and copper network cabling solutions for the Phase II expansion project of South Korea’s largest airport.
|
|
More...
|
|
|
|
|
When it came to cabling their new state of the art Honda Centre, Lings Honda wanted the very best – so Nexans LANmark-7 was a natural choice.
|
|
More...
|
|
|
|
|
June 20, 2005 - Nexans will create a new business unit under the management of Nexans Cabling Solutions called Nexans Intelligent Enterprise Solutions (IES), which will specialize in the development of products & services under the LANSense brand.
|
|
More...
|
|
|
|
|
University College London (UCL) has ‘future-proofed’ its new state-of-the-art extension to the Engineering Building by adopting an advanced networking infrastructure based on an integrated Nexans copper and fibre optic cabling solution.
|
|
More...
|
|
|
|
|
Paris, February 8, 2005 - Nexans has installed a complete Plastic Optical Fibre (POF) cabling solution for the headquarters of em2c, a provider of corporate real estate solutions based in Lyon (France).
|
|
More...
|
|
|
|
|
Nexans is the first company to offer a LAN performance warranty explicitly guaranteeing support for the future 10Gbase-T Ethernet Application.
|
|
More...
|
|
|
|
|
'1-2-Fly', the Hannover based travel agency has installed over 3000 GG45 connections in it's new HQ.
|
|
More...
|
|
|
|
|
Paris, September 3, 2002 - Nexans has successfully teamed up with Unisys and BT on a project to supply a high performance LAN to one of the most demanding customers in the world, one of the UK's Security Agencies.
|
|
More...
|
|
|
|
|
Paris, November 26, 2003 ' Mysticom, an innovative supplier of high-speed communication ICs, announced superior performance and extended data transmission distances during interoperability testing with the Nexans Cat.7 connector and cable assembly solution.
|
|
More...
|
|
|
|
|
Paris, October 21, 2003 ' Nexans has developed NVT ' Nexans Visio Template ' to provide the ideal cabling system drawing tool for use with its LANmark copper and fiber cabling systems.
|
|
More...
|
|
|
|
|
|
Paris, July 9, 2001 - Nexans, a world leader in the cable industry, has announced that installation of the latest state-of-the-art communications network has begun on 'The World' of ResidenSea, a new super luxurious cruise ship intended to be a floating home on the high seas.
|
|
More...
|
|
|
|
|
Nexans has handed over the completed campus network after the recabling and connection of eleven buildings at the University of Tilburg (UvT), The Nederlands.
|
|
More...
|
|
|
|
|
Nexans has installed a LANmark Category 6 cabling system in the 130 room four-star hotel.
|
|
More...
|
|
|
|
|
Nexans have recently handed over the Sweden's first Category 7 installation to SAAB Training Systems.
|
|
More...
|
|
|
|
|
To meet expansion needs, the organization relocated to the historical Edward Pavilion, Albert Dock, in the heart of Liverpool's dockland area. This location was ideal for the company's Client Service Centre, but presented some real challenges to Nexans and its certified installer, Groestar Communications Limited (GCL). Fully commissioned in late 2001, the network has been operating flawlessly ever since, and will be fully able to meet new data applications for years to come.
|
|
More...
|
|
|
|
|
The need to have real-time transmission, no delays and absolute system reliability led Nexans and its customer-partner, the UTI group, to recommend the use of a higher bandwidth copper solution for the center’s Local Area Network. This installation, the first in Romania, has performed flawlessly, and has rapidly become a new standard in the country.
|
|
More...
|
|
|
|
|
On completion, the building, officially known as “Messeturm”, will be over 105m tall with 31 floors. When completed, the building will house the Administrative Services Centre for the Basel Fair, in addition to other leased office space.
|
|
More...
|
|
|
|
|
The installation was completed by The Telephone Company(TTC), a Nexans Certified System Installer (CSI).
|
|
More...
|
|