News

Filter
previous 123456789101132 next

Appointment of Marc Grynberg as censor

1/19/17

The Nexans Board of Directors decided yesterday to appoint Marc Grynberg as censor with a view to proposing his candidature as member of the Board of Directors to the 2017 shareholders’ general meeting.

More...

Nexans’ HV cables to connect ScottishPower Renewables’ 714 MW wind farm to shore

ScottishPower Renewables has chosen Nexans’ submarine cables to carry energy onshore from its new 714 MW East Anglia ONE offshore windfarm.

More...

Nexans to connect continents to bring high speed broadband to West Africa

12/19/16

Huawei Marine Networks has awarded Nexans the contract to supply 6000 km of their second generation submarine Repeatered Optical Cables (ROC) for Phase II of the National Broadband Network (“NBNII”) project linking Cameroon and Brazil.

More...

DONG chooses Nexans subsea cable to link Hornsea Project One offshore wind farm

12/14/16

Danish company DONG Energy Wind Power A/S has contracted Nexans to supply and terminate a total of 139 km of three-phase subsea cable for the first of three construction phases of the Hornsea Project One wind farm, located off the Yorkshire coast.

More...

Nexans to drive sustainable transportation at its annual Technical Conference

11/30/16

Nexans will gather industry experts at its Annual Technical Conference “Sustainable Transportation and Connected Grids: a step forward in energy transition” in Paris on December 5th.

More...

Nexans launches PVC-free MOTIONLINE® HALEX automation cables

11/22/16

Nexans has launched the new MOTIONLINE® HALEX cable series, a range of halogen-free flexible automation cables for industrial applications.

More...

Sustainable Energy: The BienVEnu project wins the Grid Intelligence award

11/21/16

The BienVEnu project, led by Enedis and carried by Nexans and six other partners won the Grid Intelligence award at the 2016 European Utility Week show

More...

Nexans exhibits at SPS IPC Drives 2016

November 22 - 24

Visit us at our booth 130 in hall 5.

More...

Nexans delivers first charging stations for electric vehicles manufactured at its Donchery unit

10/17/16

Nexans is poised to deliver the first charging stations after landing a significant part of the contract to equip the sites of the national energy operator and most of France's public electricity distribution network with charging stations.

More...

New EDRMAX by Nexans™ cable ensures faster and easier grid connections for renewables

10/12/16

Nexans, in collaboration with the utility managing the majority of France’s public electricity distribution network, has developed and tested a new generation of medium voltage (MV) cables for the connection of power sources to the grid.

More...

Electric mobility: first “BienVEnu” equipped building

10/4/16

The first building equipped with BienVEnu, the electric vehicle charging solution for apartment blocks, was unveiled today.

More...

Nexans exhibits at ADIPEC 2016 in Abu Dhabi

Visit our booth #6150, Hall 6, from November, 7th to 10th, 2016

More...

Nexans power transmission innovations on land, under water and in the air

9/27/16

Higher voltages and lower losses – these were just two of the topics that arose in lectures and discussions when Nexans showcased its innovations at CIGRE 2016 in August.

More...

Nexans achieves a triple technology milestone in HVDC cable systems

9/21/16

HVDC (high voltage direct current) power links are now able to utilize Nexans state-of-the-art XLPE cables that are qualified to 320 kV, while type testing at 525 kV has just been successfully completed.

More...

Nexans to supply cables for the world's first 66 kV offshore wind farm

9/15/16

Nexans cable technology has been selected by VBMS for the world’s first 66 kV offshore wind farm.

More...

Nexans umbilicals to make essential subsea connection for BP and DEA in Egypt’s West Nile Delta project

9/13/16

Nexans has further extended its long run of success with BP oil & gas projects by winning a major contract to supply approximately 100 km of umbilicals for the next stage of the West Nile Delta project.

More...

Nexans at SITCE (19-21 Oct 2016)

Visit us @ Booth No: E07 / Hall: 403, Level 4/ Suntec Singapore Convention & Exhibition Centre

More...

AMSC and Nexans Expand Relationship to Jointly Develop and Deliver Resilient Electric Grid Projects in the U.S. and Canada

8/29/16

AMSC and Nexans today announced a partnership to market and sell AMSC’s Resilient Electric Grid (REG) system, as well as other high performance superconductor power cables, in the U.S. and Canada.

More...

Project BienVEnu, championed by Nexans, is honored by the President of the French Republic

On Friday, July 22, the Elysée Palace and the French Ministry of the Environment marked the first anniversary of the Energy Transition Law by honoring seven projects including Project BienVEnu, championed by our company, which aims to promote electric vehicle (EV) charging in collective housing.

More...

Presentation of Nexans’ Half-Year Results 2016

The presentation of Nexans’ 2016 Half-Year Results took place on Thursday, July 28, 2016 at 9.00am in Paris. This presentation is now available on Replay

More...
previous 123456789101132 next